|
Weld the bar of the Floor Chain Tie-down to
the cross-member. Weld along both sides of bar
(see Figure 4). Do not weld
chain link, it must be free to move.
NOTE: Minimum weld requirements
are 1/4” fillet welds with 1/8”
penetration. All welding to be in accordance
with A.W.S. standards.
|